Marine Parts, Boat Supplies, Pumps & Boating Equipment

 
 
Your shopping cart is empty.

Oberdorfer 8397 Shaft Packing – Stainless Steel Replacement Part

 

Oberdorfer 8397 Shaft Packing – Stainless Steel Replacement Part
Basic Info   Warranty Info   Literature   Rebate Info   Video
Brand
Oberdorfer
Manufacturer
Ingersoll Rand
Manufacturer Part Number
8397
Country of Origin
United States of America
Special Order
No
Exportable
Yes
HTS Code
8413.91.9096
Truck Freight
No
Quantity In Stock
2
On Order
0
Your Price
$38.70
Qty
 

Oberdorfer 8397 Shaft Packing – Stainless Steel Replacement Part

This is the genuine Oberdorfer 8397 packing. Unlike a mechanical seal, packing is meant to weep slightly in service, and that small flow is what lubricates and cools the shaft where it passes through the box.

When the gland has no adjustment left, or when the drip cannot be controlled at any setting, the packing is finished and the shaft should be checked for a worn track before new material goes in.

Remove every ring of the old packing rather than topping up on top of it, and stagger the joints of the new rings around the box rather than lining them up.

Key Features

  • Genuine Oberdorfer 8397 shaft packing
  • Manufactured in stainless steel
  • Adjustable dynamic seal for rotating shafts
  • Serviceable in place without dismantling the pump
  • Suited to marine and industrial circulation duties

Applications

  • Packed gland pumps in marine service
  • Raw water and seawater circulation
  • Industrial transfer and process pumps
  • Installations where in place adjustment is preferred
  • Overhaul of Oberdorfer packed pump assemblies

Specifications

  • Brand: Oberdorfer
  • Manufacturer: Ingersoll Rand
  • Manufacturer Part Number: 8397
  • Part Type: Shaft Packing
  • Material: Stainless steel
  • Condition: New

Frequently Asked Questions

Q: How much should the gland drip?
A few drops a minute with the pump running. A completely dry gland is running too tight and will score the shaft.

Q: How many rings does the box take?
That depends on the pump and the depth of the box. Count the rings that come out before they go in the bin.

Q: Can new packing be added on top of old?
It is a false economy. The old material is already consolidated and will keep the new rings from sealing.

Q: Why does new packing keep needing adjustment?
It consolidates as it beds in. Expect two or three small adjustments in the first hours and then long stability.

Not sure this is the right part? Send us a Picture of the pump plate on your pump and the CLR Marine team will confirm the correct shaft packing before you order.

Customer Reviews
Review This product

Please log in or register to post a review this product.  All reviews will be reviewed for spam before being posted.

k 1

CLR Marine is proud to serve the boating community by providing top-quality marine supplies for safety, performance, and adventure on the water.

MORE SITE LINKS

Rebate Corner

Government

Veterans Corner

Links You May Like

Contact Manufacturer

Rebate Corner

On-line Magazines

Of Interest to boasters

Video

Sitemap

FAQ

Store Policy

Troubleshooting

Frame 99